Skip to content

Pools that are built, not installed.

ExcavationSet out from the survey, cut to the profile of the shell, and battered back so the ground holds while we work in it.

PlumbingSuction, returns and the main drain go in before anything is poured, on a compacted stone base that takes the load.

ReinforcementTwo mats of steel, tied by hand, lapped at every corner. This is the part nobody ever sees again.

ShellSprayed concrete in one continuous pour, cured slowly under cover. A shell with no joints has nothing to leak through.

TilingGlass mosaic, set out from the centre line so the cuts land in the corners rather than down the middle of the floor.

FillingFilled overnight, balanced over the following week, and handed over with the plant labelled and the schedule written down.

A pool is a structure before it is a feature.

Almost everything you pay for disappears before the water goes in. The steel, the pipework, the way the concrete was placed and how long it was kept wet are none of them visible in a photograph, and all of them decide whether the pool is still watertight in twenty years.

So we keep the structure in house. The dig, the reinforcement, the sprayed shell and the plant room are our own crews, and the engineer who signs off the cage is the one who walks you through the handover. Tiling and landscaping are the only trades we bring in, and they work to our drawings.

2011

Building pools since

160

Pools completed

10 years

Structural guarantee

Six stages, one camera.

This is a single pool, photographed from the same point through the whole programme. Nothing here is a different job standing in for a stage we did not shoot.

A rectangular excavation cut into a terrace beside a modern house at dusk, with steps formed in the soil at one end.
01

Excavation

The dig is the only part of a pool that is decided by the garden rather than by us. Access, the water table and what the neighbouring walls are founded on all get checked before a machine arrives, because all three change the price and only one of them is visible from the lawn.

Grey pressure pipework laid out across the compacted base of a pool excavation, with a standpipe at the centre.
02

Plumbing

Every pipe under a pool is buried for the life of it, so each run is pressure tested and left under pressure while the shell is sprayed. If a joint is going to fail it fails on a gauge in front of you, not in four years under a tonne of concrete.

A tied steel reinforcement cage covering the floor and walls of a pool excavation.
03

Reinforcement

The cage is what makes the difference between a pool and a liner in a hole. It is designed for the ground it sits in, not taken off a standard sheet, and it is signed off on site before a single cubic metre of concrete is ordered.

The cured grey concrete shell of a pool, with formed steps and circular recesses cut for underwater lights.
04

Shell

Sprayed rather than poured, so the concrete is placed against the steel at pressure and the walls and floor become one piece. It is then kept wet for a week. Concrete that dries fast is concrete that cracks, and the week costs less than the crack.

A pool finished in dark blue glass mosaic before filling, with underwater lights set into the walls.
05

Tiling

Mosaic is the finish that decides what colour the water is, and it is the one most often value engineered out. We set it out on paper first, so the pattern breaks where the eye expects it to and the waterline band runs level all the way round.

The finished pool at dusk, full and lit from below, its dark mosaic reading deep blue through the water.
06

Filling

The last day is a handover, not a disappearance. You get the plant room walked through, the valves labelled, the winter routine written out, and a number that reaches the person who built it rather than a call centre.

Four shapes, four different problems.

Infinity edge

A wall built low on one side with a catch tank behind it. It wants ground that falls away and a pump sized for the whole edge, not for the pool.

Deck level

The water sits flush with the paving and runs into a slot the whole way round. The hardest to set out and the best looking when it is right.

Lap pool

Long, narrow, usually tight against a boundary. The running cost is decided by the surface area here, so this is where a cover earns its money.

Courtyard pool

Small, deep and sheltered. Access is the whole job: the concrete, the steel and the plant all come through the house or over the roof.

The finished pool photographed portrait, lit from below at dusk, with the timber deck and the house beyond.

Ridge house, Begur. Deck level on three sides, mosaic waterline, lit from four points.

What is in the price.

Structure

The part that has to last without being touched.

  • Sprayed concrete shell

    Placed in one continuous operation against the steel, so walls and floor are one piece with no construction joint.

  • Engineered reinforcement

    Designed for the ground the pool sits in and the loads around it, then checked on site before concrete is ordered.

  • Tested pipework

    Every buried run pressurised before the shell goes on and left under pressure while it is sprayed.

Water

Sized against the volume, not against the catalogue.

  • Filtration

    Turnover calculated from the actual volume and the way the pool is used, which is what decides pump size, not the other way round.

  • Dosing

    Salt chlorination or measured liquid dosing, with the probes somewhere you can reach without emptying a cupboard.

  • Heating

    Heat pump matched to the surface area and the months you want to swim, quoted with the running cost rather than without it.

Control

What you are left holding on the last day.

  • Plant room

    Laid out so every valve can be reached and labelled, with room to stand up and work on it.

  • Automation

    Filtration, heating and lighting on one controller, with manual overrides that still work when the app does not.

  • Handover and service

    The routine written down, the first service booked, and a number that reaches the people who built it.

Ridge house, Begur.

A terrace cut into a slope, with the house on two sides of it and a drop on the third. The pool had to be set out so the deck stayed level all the way round and the plant could be buried under the approach rather than built as a shed.

Pool

12.0 x 4.2 m

Depth

1.2 to 1.9 m

Shell

Sprayed concrete, 250 mm

Finish

25 mm glass mosaic

Edge

Deck level, three sides

Programme

14 weeks

The completed pool at dusk, full and lit from below, the house and its glazing behind it.
Close view of the dark blue glass mosaic across the pool floor, seen through lit water.
Mosaic floor under lit water
The stone coping along the long side of the pool, with the darker waterline band below it.
Stone coping over the waterline band
The junction between the pool edge and the timber deck, with a lounger beyond.
Deck junction, no upstand
An underwater light set flush into the mosaic wall of the pool.
Lights set flush into the wall
“They talked us out of the infinity edge on the first visit and explained why. That was the moment we stopped getting other quotes.”
Marta Ferrer/Ridge house, Begur
“The plant room is the part I did not think I would care about. Everything is labelled and I can reach all of it standing up.”
Tom Whitfield/Courtyard pool, Girona
“Fourteen weeks, and the only surprise was the rock at three metres, which they had warned us about before they started.”
Céline Roux/Lap pool, Cadaqués

Come and look at the garden.

The first visit takes an hour and costs nothing. We look at access, levels and where the plant could go, and you get a written range before anyone draws anything.

Yard
Carrer del Riu 12, Girona

Where it is, how a machine would get in, and whether the ground falls away.

Concept page by Abdulrahman Salameh · Order yours from 400 JD →