
Kilmory
An island with a marble waterfall, a tall bank of storage behind, and a run long enough for two people to work at once.
Bare shellA blank wall, a floor, and the measurements we took in March.
CarcassesThe tall run goes in first, scribed to a wall that is never quite straight.
Stone and frontsHoned marble, fumed oak fronts, appliances hung and levelled.
FinishedFour days after we arrived, you get your kitchen back with the dust gone.
So we measure your walls before we draw anything, cut every carcass to those measurements in our own workshop, and put the whole run in during one working week. Nothing is trimmed to fit on your floor.

An island with a marble waterfall, a tall bank of storage behind, and a run long enough for two people to work at once.

The same island, sized down for a plan where the kitchen shares the room with a table.

One wall, floor to ceiling. Ovens at eye level, everything else behind a flat front.
Most apartments have one wall that refuses to cooperate. When that happens we draw the run around it rather than selling you the nearest standard size.
The list is short because we buy these four in quantity and know how they behave after ten years in a kitchen.

European oak darkened all the way through in an ammonia kiln, so a chip shows the same colour as the surface.

Cut from one block per kitchen, so the veining runs on from the worktop down the side of the island.

Pendants, handles and taps in unlacquered brass. It dulls in the first year and then stops changing.

For the frames and the plinths. Waxed rather than painted, so it takes a knock without showing a scratch.
About eight weeks in total, and only the last four days of it happen in your flat.
We come out with a laser and a level and take the room down to the millimetre, including how far the floor falls across the span.
You get elevations, not a mood board. Every door swing, every socket, and the exact width of the gap beside the fridge.
Carcasses, fronts and stone are made to those drawings in the workshop over about six weeks, and dry assembled before anything ships.
Two fitters, four days, one skip. We take the old kitchen out on the Monday and you cook in the new one on the Friday.
“They found a fall in our floor that two other firms missed, and priced the fix before we signed.”
“We specify Norval when the client wants a schedule they can hold their builder to.”
The survey takes about an hour and costs nothing. You get the measured drawings whether or not you go ahead with us.
